Eko Hot Blog reports that Alex Otti, the Governor of Abia State has said Aba will be independently powered through the Geometric Power Limited’s power plant in one or two months.
Otti disclosed this on Tuesday in a statement through his official Twitter handle when the Chairman of Geometric Power Limited, Prof Bartholomew Nnaji, a former Minister of Power and his team paid him a courtesy visit.
Gov Otti expressed delight that Aba will soon have a reliable power supply.
He stated that the State and GPL were in talks with the Nigerian National Petroleum Corporation Limited to resolve the gas supply issue.
“Right now, we are buying power from the National Grid, that is why power is not reliable yet, and so, we would like to ask our citizens of Aba to bear with us that we are getting there. We are there.
“The turbines to power the electricity plant, which were taken abroad for maintenance, have been brought back to the plant and reinstalled.
“We are now working with the NNPC to resolve the gas supply issue to the plant,” he said.
The Geometric Power Aba Limited, located in Alaoji Aba, is expected to add 188 megawatts to Nigeria’s electricity output.
Click To Watch Our Video Of The Week
Advertise or Publish a Story on EkoHot Blog:
Kindly contact us at [email protected]. Breaking stories should be sent to the above email and substantiated with pictorial evidence.
Citizen journalists will receive a token as data incentive.
Call or Whatsapp: 0803 561 7233, 0703 414 5611