Connect with us

News

Lagos Hospital Elevator Still Unreplaced Five Months After Dr. Vwaere Diaso’s Tragic Death

Published

on

Lagos hospital elevator

EKO HOT BLOG reports that five months after an elevator accident led to the death of a House Officer, Dr Vwaere Diaso, at the General Hospital, Odan Lagos, the equipment was yet to be replaced.

This online media platform Diaso was killed after the elevator crashed from the 10th floor to the ground floor of the 131-year-old hospital.

EDITOR’S PICKS

A colleague of the deceased told our correspondent when he visited the scene of the accident in August 2023 that the management of the hospital was aware of the poor state of the elevator.

“On multiple occasions, the elevator has stopped while we were inside. And there’s no maintenance,” he said.

Also, information from the panel set up by the state government to look into the tragedy revealed that the doctor did not die immediately after the crash but was trapped in the plunged and damaged elevator for an hour before being extracted and provided medical care.

The government further stated that it has sacked and blacklisted the facility managers and suspended the General Manager of Lagos State Infrastructure and Asset Management Agency, Adenike Adekanbi.

A few days after the doctor was buried, the Lagos State Governor, Babajide Sanwo-Olu, announced his visit to the hospital on his Instagram page, where he mentioned that speaking to the house officers present at the hospital and “they gave me an insight into their needs, and I gave my word that we have already got on it.”

Meanwhile, a visit by the Punch to the 10-storied doctors’ residence, discovered that for five months, doctors in the residence had to take the stairs to their apartments because a new elevator was yet to be installed.

It was found out that the exit area to the lift was barricaded with a three-pieced black marine construction board.

A larger poster “Restricted area, construction site. No unauthorised access” alongside other words, numbers, and symbols pasted on the board.

When contacted, the state’s Commissioner for Information and Strategy, Gbenga Omotoso, and the Permanent Secretary for the Ministry of Health, Olusegun Ogboye, both insisted that the contract to replace the lift and renovate the building had been awarded to the contractors.

FURTHER READING  

But no sign of renovation or billboards proposing the beginning of renovation on the premises could be seen at the time our correspondent visited the place.

Click to watch our video of the week




Advertise or Publish a Story on EkoHot Blog:

Kindly contact us at [email protected]. Breaking stories should be sent to the above email and substantiated with pictorial evidence.

Citizen journalists will receive a token as data incentive.

Call or Whatsapp: 0803 561 7233, 0703 414 5611




 

 


DISCLAIMER: Opinion articles are solely the responsibility of the author and does not necessarily reflect the views of the publishers Of  EKO HOT BLOG

For publication of your News Contents, articles, Videos or any other News Worthy Materials, please send to [email protected]

For Advert and other info, you can call 08035617233 or send a WhatsApp Message to 08035617233.

Please drop your comments

Copyright © Ekohotblog

MGID