Connect with us

News

FG Considers Renewable Plants To Solve Power Problems

Published

on

Renewable power

EKO HOT BLOG reports that the Federal Government is planning the construction of renewable power plants to boost electricity generation across the nation.

The Minister for Power, Adebayo Adelabu, disclosed this during a meeting with foreign agencies on Thursday.

EDITOR’S PICKS

In a chat with Adelabu’s media aide, Bolaji Tunji, on Friday, the minister was quoted to have highlighted that the creation of renewable power plants would be one of his strategies to ensure incremental improvement in national power supply.

A renewable power plant is a facility that generates electricity from a renewable energy source, such as solar, wind, water, or geothermal energy.

These types of power plants harness the power of the sun, wind, water, or the earth’s heat to produce electricity without using fossil fuels like coal, oil, or natural gas.

Adelabu had promised to ensure that the Rural Electrification Agency lives up to expectations by serving the underserved and the unserved rural communities that may not be commercially attractive to the distribution companies.

According to Tunji, the minister is “focusing on distributed power by intensifying efforts to raise the volume of renewable energy to national capacity, with focus on developing small hydropower plants along the 26 small dams in the county”.

The hydropower plants, the minister had stated, can be “hybridised with solar when the water level goes down”.

He added that solar options are being considered for the northern part of the country, including the use of windmills to generate power offshore along the coastal part of the country.

Renewable power

Renewable Power plants

The minister said further that the main problem of the sector is liquidity and funding.

He added that the sector is supposed to generate funds if allowed to operate a commercial model, where all the costs attributed to the generation of power, transmission and distribution are recovered through the tariffs, while the operators are given a good markup.

Adelabu was reported to have noted that the power sector is not allowed to charge cost-reflective tariffs because the government promised subsidy but with no timely release of money.

“Once the sector suffers from liquidity challenge, there would be no investment in the sector and that is why the structures are dilapidated.

“It’s important we resolve the liquidity issue,” he had emphasised.

FURTHER READING  

The development partners including representatives from the European Union, the United States Agency for International Development, United Nations Industrial Development Organisation, the World Bank, Japan International Cooperation Agency, African Development Bank, and others were said to have assured Adelabu of continued support because his briefing had given a clear direction on how to resolve some of the issues in the power sector.
Click to watch our video of the week




Advertise or Publish a Story on EkoHot Blog:

Kindly contact us at [email protected]. Breaking stories should be sent to the above email and substantiated with pictorial evidence.

Citizen journalists will receive a token as data incentive.

Call or Whatsapp: 0803 561 7233, 0703 414 5611




 

 


DISCLAIMER: Opinion articles are solely the responsibility of the author and does not necessarily reflect the views of the publishers Of  EKO HOT BLOG

For publication of your News Contents, articles, Videos or any other News Worthy Materials, please send to [email protected]

For Advert and other info, you can call 08035617233 or send a WhatsApp Message to 08035617233.

Please drop your comments

Copyright © Ekohotblog

MGID