Connect with us

EKO NEWS

LASTMA Has A New Message For Lagos Motorists As Third Mainland Bridge Reopens

Published

on

Third Mainland Bridge
  • The third mainland bridge was partially closed from January 9, 2024, for repairs.
  • The repairs have been completed, clearing the way for the bridge to reopen to traffic.
  • The reopening of the bridge has prompted a message from the traffic management agency in Lagos.

Eko Hot Blog reports that Lagos State Traffic Management Authority (LASTMA) has warned motorists to maintain speed limits while driving on the long stretch of the newly renovated Third Mainland Bridge linking Mainland and other parts of the State.

The General Manager of the Agency, Mr. Olalekan Bakare Oki gave this warning on Wednesday while addressing Officers of the Agency whose purview falls within the Third Mainland Bridge operational areas.

EDITOR’S PICKS

According to Oki, the comprehensively repaired bridge is scintillating and fascinating to drive on without any impediments as this may be too tempting and risky not to observe speed limit thereby resulting in untoward consequences for motorists.

“The government has installed state-of-the-art facilities that will aid motorists in navigating the entire bridge to their various destinations within a reasonable travel time,” the LASTMA boss said.

LASTMA General Assembly, Mr. Olalekan Bakare Oki

LASTMA General Assembly, Mr. Olalekan Bakare Oki

He urged motorists to obey every traffic signs and other installed traffic related electronic devices where necessary and keep to the approved speed limit.

“Motorists must be conscious of time and plan their journey ahead to avoid unnecessary over speeding while using the bridge and any other link roads across the State,” Oki said.

He assured the motoring public that the Agency would deploy more men, patrol and recovery vehicles to ensure safety of motorists and timely rescue intervention on the bridge.

The LASTMA General Manager, however, cautioned owners/drivers of vehicles to ensure that their vehicles are in good condition before playing the bridge as the agency would frown at any avoidable obstacles capable of hindering vehicular movements on the flyover.

FURTHER READING

The Federal Government is set to open the Third Mainland Bridge to traffic on Thursday, April 4, 2024.

Click here to watch video of the week:




Advertise or Publish a Story on EkoHot Blog:

Kindly contact us at [email protected]. Breaking stories should be sent to the above email and substantiated with pictorial evidence.

Citizen journalists will receive a token as data incentive.

Call or Whatsapp: 0803 561 7233, 0703 414 5611




 

 


DISCLAIMER: Opinion articles are solely the responsibility of the author and does not necessarily reflect the views of the publishers Of  EKO HOT BLOG

For publication of your News Contents, articles, Videos or any other News Worthy Materials, please send to [email protected]

For Advert and other info, you can call 08035617233 or send a WhatsApp Message to 08035617233.

Please drop your comments

Copyright © Ekohotblog

MGID