Connect with us

EKO NEWS

Lagos Govt Announces Closure Of Marine Beach Bridge For 5 Months

Published

on

The Lagos State Government has announced a plan to effect partial closure of the Marine Beach Bridge, Apapa, to vehicular movement,  from May 27 to Oct. 21.

The state Commissioner for Transportation, Dr Frederic Oladeinde,  made the announcement in a statement in Lagos.

He said the closure of the bridge was to enable its repair of the which, according to him, was long overdue.

“The repair by the Federal Ministry of Works is long overdue and is vital for the safety of the people of Lagos State, especially motorists that ply the bridge to access different parts of the state.

“Necessary palliative works have been carried out on all alternative routes around the construction site to make them to be in good condition to ease movement during the construction period.

“The repair work, which comprise bearing and expansion joint replacement, is planned to be executed in two phases, with each phase focusing on one lane of the bridge at a time.

” The first phase will be handling the lane inbound Apapa while the second phase will be designated to work on the lane that conveys vehicles outside the axis,” he said.

Oladeinde said that the partial closure of the bridge by Total Gas, inward Apapa, would last for five months.

Oladeinde said that a contraflow of 200 metres had been designed for vehicles to realign with a proper direction inward Ajegunle or Wharf Road, Apapa.

He said that motorists descending to Total Gas would drive without any hindrance.

The commissioner noted that operatives of the Lagos State Traffic Management Authority would be stationed at the construction locations to  ease traffic.

Oladeinde appealed to motorists and residents of the area to cooperate with traffic management agencies deployed to the areas.

“The state government expresses its commitment to providing a transportation system that will meet the needs of a larger population in an emerging smart city,” he said.

The News Agency of Nigeria (NAN) reports that the Public Affairs Unit of the State Ministry of Transportation (MOT) had on March 27 announced the closure of the Marine Bridge, partially from March 28 to Aug. 15 for repair.

However, on March 28, the ministry suspended the plan due to the COVID-19 pandemic.




Advertise or Publish a Story on EkoHot Blog:

Kindly contact us at [email protected]. Breaking stories should be sent to the above email and substantiated with pictorial evidence.

Citizen journalists will receive a token as data incentive.

Call or Whatsapp: 0803 561 7233, 0703 414 5611




 

 


DISCLAIMER: Opinion articles are solely the responsibility of the author and does not necessarily reflect the views of the publishers Of  EKO HOT BLOG

For publication of your News Contents, articles, Videos or any other News Worthy Materials, please send to [email protected]

For Advert and other info, you can call 08035617233 or send a WhatsApp Message to 08035617233.

Please drop your comments

Copyright © Ekohotblog

MGID