Connect with us

EKO NEWS

FG Set To Close Apapa-Oshodi Expressway

Published

on

Apapa-Oshodi Expressway, Apapa Gridlock, Residents, Lagos, Traffic Team
  • The Federal Government (FG) has concluded plans to close the Apapa-Oshodi Expressway.

EKO HOT BLOG reports that the Federal Government (FG) has concluded plans to divert traffic from the ever-busy Apapa-Oshodi Expressway from August 9, 2021.

The latest development followed the fire outbreak that occurred in January 2021 on the Apapa-Oshodi Expressway after a tanker explosion around the Airport Flyover Bridge at Toyota on Oshodi/Isolo Expressway.

EKO HOT BLOG recalls that after the tanker explosion, an integrity test was thereafter carried out on the bridge to determine its structural status.

In line with this development, it was gathered that the Federal Ministry of Works is now set to commence emergency repairs on the bridge from the 9th of August, through the 3rd of October, 2021.

The Lagos State Commissioner for Transportation, Dr. Frederic Oladeinde, explained that the Oshodi bound lane would be barred from vehicular movement from 12:00 midnight of 9th August 2021 and reopened partially on the midnight of 14th August 2021 for the first phase of repairs.

READ ALSO: Tragedy Averted As Trailer Falls Off Oshodi Bridge

According to Daily Trust, he stated that the second phase will commence immediately for a duration of seven weeks to hasten the rehabilitation.

The commissioner disclosed that motorists would be diverted from the main carriageway to the service lane of the Oshodi-bound lane for the first five days and subsequently for seven weeks.

According to the diversion plan, traffic heading towards the Oshodi-bound lane would be diverted to the service lane at Ladipo, while those heading to Mile 2 would be diverted to the Airport road.

Two lanes on both Oshodi and Mile 2-bound lanes would equally be open to vehicular movement to ease movement, Oladehinde added.

The commissioner, however, assured that the Lagos State Traffic Management Authority (LASTMA) would be on the ground to manage the flow of movement and minimize inconveniences that might arise as a result of the rehabilitation of the bridge.

Lagos-Ibadan Expressway, Lagos To Shut Marine Bridge For Emergency Repairs, Falomo Bridge

Oladehinde added that alternative roads have been identified and fixed in preparation for the construction.

He further appealed to motorists to drive with caution and patience, saying, “This will help ameliorate the traffic stress that may accompany the rehabilitation process.”

YOU MAY ALSO LIKE




Advertise or Publish a Story on EkoHot Blog:

Kindly contact us at [email protected]. Breaking stories should be sent to the above email and substantiated with pictorial evidence.

Citizen journalists will receive a token as data incentive.

Call or Whatsapp: 0803 561 7233, 0703 414 5611




 

 


DISCLAIMER: Opinion articles are solely the responsibility of the author and does not necessarily reflect the views of the publishers Of  EKO HOT BLOG

For publication of your News Contents, articles, Videos or any other News Worthy Materials, please send to [email protected]

For Advert and other info, you can call 08035617233 or send a WhatsApp Message to 08035617233.

Please drop your comments

Copyright © Ekohotblog

MGID