EKO HOT BLOG reports that in line with the ongoing construction of the Opebi Link Bridge, the Lagos State Government has adjusted the traffic diversion plan for the re-construction of Thomas Ajufo inwards Sheraton Link Bridge axis from Monday, 16th October, 2023 for a duration of 4 weeks.
Commissoner for Transportation, Oluwaseun Osiyemi, announced the diversion plan.
EDITOR’S PICKS
PDP BoT Demands Resignation Of Anyanwu As National Secretary
INEC Makes U-Turn On Manually Results Transmission Of Bayelsa, Imo, Kogi States Elections
Lagos: Jandor Files 34 Grounds Of Appeal Against Tribunal On Sanwo-Olu’s Election Victory Verdict
According to him, “Consequently the following alternative routes will be available to motorists during the diversion period; Motorists heading towards Opebi Road will be allowed to use one side of the Opebi Road Carriageway as the construction requires the second lane to be closed;
“Also, Motorists heading towards Mobolaji Bank Anthony Way from Allen Avenue/Toyin Street will make use of Toyin Street via Ola Ayinde Street to connect Ikeja Under Bridge and continue their journeys.”
FURTHER READING
Ondo Assembly Deny Suspending Impeachment Process Against Aiyedatiwa
Oil Marketers Set To End NNPCL’s Fuel Monopoly, Resume Importation Of Petrol
Tinubu, Sultan, Ado Bayero, Others Listed Among 500 World Influential Muslims
He therefore, urged motorists to obey traffic signs and the directive of relevant traffic management authorities to ensure a continuous flow of traffic.
Click to watch our video of the week
Discover more from EkoHotBlog
Subscribe to get the latest posts to your email.
Advertise or Publish a Story on EkoHot Blog:
Kindly contact us at [email protected]. Breaking stories should be sent to the above email and substantiated with pictorial evidence.
Citizen journalists will receive a token as data incentive.
Call or Whatsapp: 0803 561 7233, 0703 414 5611