EKO NEWS
LASBCA Pulls Down Structures Under Powerline (PHOTOS)
The Lagos State Building Control Agency (LASBCA) has pulled down an ongoing illegal construction built under a powerline along Church Street, off AIT Road, Alagbado, Lagos.
Eko Hot Blog reports that this was disclosed by the General Manager of the Agency, Arc Gbolahan Oki during the Agency team’s routine monitoring and enforcement exercise carried out at Alimosho Local Government Area of Lagos.
EDITOR’S PICKS
-
Buhari Commissions Pinnacle’s Petroleum Offtake Facility, Lekki
-
Kwara Won’t Return To Under-Development Era – AbdulRazaq
-
NDDC: IYC Hails Buhari For Disengaging Efiong Akwa
Oki, who was represented by the Director of Enforcement and Compliance Unit, Olusoji Olaopa during the monitoring exercise, stated the owner/developer did not only build under the powerline but that the entire structure is in violation of the building codes of the State.
According to him: “Some of the other violations include inadequate setbacks, airspace, built on the fence wall as well as being too close to a transformer, an action which poses a threat to the occupants and other residents in the area”.
The General Manager maintained that before the demolition of the structure was carried out, the owner was duly served all Statutory Notices ranging from Contravention, Stop Work Order and Demolition Notices by the Agency in line with the Lagos State Building Codes.
In a similar development, a critically distressed three-floor structure located at 9, Yusuf Bishi Street, Egbe-Idimu, Alimosho, whose owner had been duly served quit/evacuation notice after the building failed the Non-Destructive Test (NDT) was sealed by the Agency and occupants evacuated while plans have been put in place to remove the building.
FURTHER READINGS
-
Kwara: Police Vow To Partner EFCC To Clamp Down On Illegal Miners
-
LP Appoints Acting Youth Leader After Suspension Of Office Holder
-
JUST IN: Dubai Rejects Nigerians’ Visa Applications
Over seven other illegal and non-conforming buildings were also sealed due to various contraventions ranging from, building without approval, no letter of authorisation to commence construction from LASBCA, and breaking of government seals amongst others.
Click to watch our video of the week:
Advertise or Publish a Story on EkoHot Blog:
Kindly contact us at [email protected]. Breaking stories should be sent to the above email and substantiated with pictorial evidence.
Citizen journalists will receive a token as data incentive.
Call or Whatsapp: 0803 561 7233, 0703 414 5611