Connect with us

News

Makinde Approves Eight Road For Reconstruction

Published

on

Oyo State Governor, Engineer Seyi Makinde has approved for immediate rehabilitation and reconstruction, a total of eight road projects in various zones of the State.

The State’s Commissioner for Public Works and Transport, Professor Raphael Afonja, who revealed this development on Friday in a statement, said that infrastructural development remained a key focus of the present administration.

The Commissioner quoted the governor as saying that his administration was prepared to ensure the uplift of infrastructure in State, adding the government would ensure that adequate attention is given to road infrastructure that target the economic expansion drive of the state.

The statement further indicated that the determination to ensure infrastructural growth in the state informed the decision of Governor Makinde to devote a large chunk of the 2020 budget (23.93 percent) to that sector.

Read Also: Coronavirus: Lagos Assembly Approves N20b To Fight Virus

It reinstated the decision of the administration to institute a culture of quality road construction in the State, adding that the government was ready to build roads that would stand the test of time.

According to the statement, the present administration in Oyo State has a 20-year plan for road sustainability in the State.

The statement also revealed that Governor Seyi Makinde has also given approval for reconstruction of failed hydraulic structures in different geographical zones across the state.
“Some of our major roads within the State have been disconnected and this is occasioned by the collapse and dilapidation of the hydraulic structures (bridges and culverts) on these roads during the last year raining season.”
Engineers from the Ministry of Public Works and Infrastructure have visited the locations of the affected hydraulic structures, while necessary appraisal reports have been submitted.

Afonja said: “The carefully selected roads from the various zones of the State, which were  approved by His Excellency for rehabilitation and reconstruction include the following:
1.  Airport -Ajia-New Ife Express way with spur to Amuloko (21KM).
2.  Apete-Awotan-Akufo junction road (12.0KM).
3.  Saki-Ogbooro-Igboho (44.70Km).
4.  Reconstruction of Under G-Stadium-LAUTECH Gate Road, Ogbomoso (3.0KM).
5.  Takie-FGGC Road, Ogbomoso (2.5KM).
6.  Reconstruction of Isaba-Ogundoyin Road, Eruwa (2.50KM).
7.  Rehabilitation of Gedu-Oroki-Sabo-Asipa Road, Oyo (5.20KM).
8.  Akingbile-Lagbeja-Ajibode road (3.0KM).”




Advertise or Publish a Story on EkoHot Blog:

Kindly contact us at [email protected]. Breaking stories should be sent to the above email and substantiated with pictorial evidence.

Citizen journalists will receive a token as data incentive.

Call or Whatsapp: 0803 561 7233, 0703 414 5611




 

 


DISCLAIMER: Opinion articles are solely the responsibility of the author and does not necessarily reflect the views of the publishers Of  EKO HOT BLOG

For publication of your News Contents, articles, Videos or any other News Worthy Materials, please send to [email protected]

For Advert and other info, you can call 08035617233 or send a WhatsApp Message to 08035617233.

Please drop your comments

Copyright © Ekohotblog

MGID