- Federal Government Suspends Kara Bridge Rehabilitation Indefinitely
- Kara Bridge Repairs Suspended Indefinitely, New Date Yet To Be Announced
- Kara Bridge: Federal Ministry Of Works Suspends Rehabilitation Plans
The Federal Ministry of Works has indefinitely suspended the planned rehabilitation of the Kara Bridge along the Lagos Ibadan Expressway.
The repair work was scheduled to begin on Tuesday, July 28, 2026, and was expected to last for two weeks.
EDITOR’S PICKS
- Olodo Uprising: Sanwo-Olu Advises Youths to Embrace Knowledge, Curiosity
- BBN Season 11 Kicks Off with Unveiling of 24 Housemates Competing for ₦160m Grand Prize
- Why Africa Must Stop Exporting Raw Materials, Lessons From Benin for Nigeria
EKO HOT BLOG reports that the suspension was announced on Tuesday by the Acting Federal Controller of Works in Ogun State, Engr. R. Adeleye.
Adeleye said a new date for the rehabilitation would be announced at a later time.
In a statement announcing the development, Adeleye apologised to motorists and other road users for the last minute decision to suspend the project.
“I am very sorry to announce at this eleventh hour that we have put on hold the proposed Kara Bridge expansion joints repair scheduled to commence this morning, July 28, 2026, on directives from above due to some very crucial reasons,” he said.
He added, “A rescheduled date shall be announced in due course.”
The ministry did not disclose the specific reasons for the suspension.
Before the suspension, the Lagos State Commissioner for Transportation, Oluwaseun Osiyemi, had issued a traffic advisory to motorists concerning the planned rehabilitation.
The repair work was aimed at improving the safety and durability of the bridge.
Osiyemi had explained that the existing four lane carriageway would be temporarily reduced to two lanes along a 1.5 kilometre stretch to provide a safe working area for contractors.
The planned lane reduction was expected to cause partial traffic disruptions around the Kara axis during the rehabilitation period.
The commissioner had therefore urged motorists to obey traffic rules and cooperate with traffic management officials deployed to the area.
Osiyemi also warned that moderate traffic could build up around the Fatgbems Turn area as some motorists might make U turns or use alternative routes to avoid delays.
However, he said traffic heading towards Ibadan beyond Fatgbems Turn was expected to move with minimal disruption.
The commissioner had advised motorists to plan their journeys ahead, use alternative routes where possible and follow instructions from traffic management officials.

As of the time of filing this report, the Federal Ministry of Works had yet to announce a new date for the commencement of the Kara Bridge expansion joint repairs.





